2026-10-08
The Second Cogitator Takes Shape
CASTRO Cogitator has reached reported desktop-and-solver integration, with actual 64-, 128-, and 256-zone runs. Checkpoint/restart, cancellation, and local retrieval have been exercised. Release qualification remains underway.
CASTRO integration reported; release qualification ongoing.
2026-10-08
Luke Inferior Nano: The Art of Asking
A proposed 2B local prompt engineer takes shape around the existing Grill Me interaction: reconstruct intent, challenge missing assumptions, preserve corrections, and prepare Codex-ready assignments. The specialized model remains an experimental concept, not a trained release.
Prompt-engineer concept; specialized model not yet trained.
2026-10-08
A Sidecar in the CASTRO Forge
A steering amendment requests an optional experimental prompt-engineering chat alongside CASTRO's scientific workflow. It is scoped as an isolated sidecar to protect the solver, scientific controls, and release qualification; actual integration remains to be verified.
CASTRO optional sidecar requested; integration unverified.
2026-10-07
The Cogitator Awakens
WarpX Cogitator emerges as an experimental scientific application, combining a real simulation workflow with an original game-inspired environment and Codex assistance.
Experimental application; broader release qualification not implied.
2026-10-07
Factory Mark 0
Chiron's Cogitator Factory begins testing whether the architecture and development practices from one scientific application can be transferred to another.
Replication program initiated; performance and generalizability require testing.